Dear PP Gurus
I have one case where as soon as Production order is created ,when i goto availability check for components the system shows few components are required where as stock is available when i check in MMBE for all those components under unrestricted use.
This problem has occurred recently where as for the same BOM and same Finished material this problem was not coming before.
Let me tell you that there was no modification in either routing nor BOM.
Also i have checked sotrage location allocation for components in Production order.
Regards
Abdul