Hi ,
i have below requirement..
In APO planned order / preq i want to see material revision level information .
Step 1 : bringing material revision level info to APO ( material revision level , valid from date )
Step 2 : SNP/ PPDS heuristic should attach this information to each planned orders / preq . i want to see the material revision level , valid from date for each planned order / preq
This is already available in ECC . you can see this in MD04 screen. in ECC there is a user exit REVISION_LEVEL_SELECT which is doing this while running MRP or during manual creation of planned order .
I need this same concept (material rev level , valid from date) to be calculated in APO for each planned order and should be visible in RRP3 screen.
Please let me know. how it can be done.
Regards
Rajesh