Hi Everyone,
Iam doing EH7 Upgrade in the sysem where i have 2 CPU cores and 16 GB of RAM available. i went through some notes and i could not find an exact calculation for R3trans , R3load and and Parallel Phases .
Notes read: 1127194, 1616401
Curent with Standard confiuration. below is the values i can see
ABAP process (UPTIME) 3
ABAP Process (Downtime) 6
SQL Process (UPTIME) 3
SQL Process (DOWNTIME) 6
R3trans Process (Uptime) 3
R3Trans Process (DDOWNTIME) 6
R3Load (Uptime) 8
R3load (Downtime) 40
Parallel Phases (Uptime) 3
Parallel Phases 9Downtime) 3
can someone help me calculate the Uptime value?
Thanks,
ASK