Hi Gurus,
Please help me to understand some basic stuff :
1. If an operation has two phases(setup and production) --what setting in phase makes it a setup phase ?
2. Whether the duration of a phase is fixed or variable depends upon the scheduling formula assigned to the workcenter. Correct ?
3. If a phase is assigned labour time as 0.5 hr and machine(workcenter) time as 1 hr -- and this phase is assigned only workcenter and not the labour resource then :
(a) How will the capacity be consumed on labour resource ? Do we have to create labour resource as secondary resource ?
(b) In APO -- how will the secondary resource appear in PDS ?
Thanks in anticipation!