Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 8150

Exchange Rate Differences During Goods Receipts

$
0
0

Hi SAP Experts,

 

Would like to know if it is possible to separate price differences due to change in purchase price and exchange rate at the point of Goods Receipts (GR).

 

Scenario 1 (No change in purchase price)

Exchange Rate

Type P - used for Product Cost Planning: 1 USD = 1.5 SGD

Type M - used during GR: 1 USD = 1.3 SGD

 

SGD - Local Currency

 

For purchased materials, costing is pulling from purchase info record:

PIR for material at the point of product costing at the time of budget: USD 10

PIR for material at the point of product costing at the point of PO creation: USD 10

 

Standard cost of material: SGD 15

 

Quantity purchased = 100

 

Current result during GR:

Postings                         
Doc Currency (USD)
Loc Currency (SGD)

DR Stock

10001500
CR GR/IR(1000)(1300)
CR PPV0(200)

 

Desired result during GR:

Postings                         
Doc Currency (USD)
Loc Currency (SGD)

DR Stock

10001500
CR GR/IR(1000)(1300)
CR Exchange Rate Diff0(200)

 

 

Scenario 2 (Change in purchase price)

PIR for material at the point of product costing at the time of budget: USD 10

PIR for material at the point of product costing at the point of PO creation: USD 12

 

Current result during GR:

Postings                         
Doc Currency (USD)
Loc Currency (SGD)

DR Stock

10001500
CR GR/IR(1200)(1560)
DR PPV20060

 

Desired result during GR:

Postings                         
Doc Currency (USD)
Loc Currency (SGD)

DR Stock

10001500
CR GR/IR(1200)(1560)
CR Exchange Rate Diff0(200)
DR PPV200260

 

 

Currently, in my configuration, the differences are combined into a price difference (Purchase Price Variance) account, regardless of purchase price or exchange rate differences. The desired posting scheme is to have this separated to enable proper analysis of 'true' PPV and Exchange Rate differences. is there a way to enable this?

 

In our installation, we have Material Ledger and Actual Costing as activated for the plant.

 

Thank you for your reply.

 

Teck Liang


Viewing all articles
Browse latest Browse all 8150

Trending Articles