Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 8150

SUM issue with XSS components during maintenance on NDWI controlled landscape

$
0
0

Hello,

 

This is our first time using SUM/MOpz for a release upgrade procedure as the last JSPM update disabled the launch program.

 

During our test upgrade of our Enterprise Portal HUB landscape (source NW 7.02 -> target NW 7.4) with EHP5 for ERP 6.0 - XSS Self Services for backend ERP system installed. I've encountered an issue with SUM in the Configuration stage - Target Release Components screen. the only 5 objects SUM cannot handle automatically are the XSS Self Services target release components:

 

SAPPCUI_GP         633

SAP_ESS               633

SAP_ESS_LGP     633

SAP_MSS               630

UTXSSLGP             633

 

The only option I have is to scan inbox to rebuild the component list. I'm assuming, since these components are being modified by us and delivered/deployed thru NWDI track, their source location on the system is now the track name instead of the SAP delivered MAIN_ERP53VAL_C. Which means that SUM is expecting updated modified SCAs from NWDI for new 633 versions in the download directory before proceeding to next phase. However, in NWDI landscape configurator for this track, I have checked the option to mark system in NWDI control and verified SUM recognizes the system as NWDI controlled.

 

I'm struggling to understand the where the disconnect is between SUM and NWDI for theses components as I thought that SUM is supposed to ignore the DEV NWDI developed and wait for updates modified SCAs only in QA and PROD. Does anyone else have experience with this process to help me?

 

Regards,

Paul


Viewing all articles
Browse latest Browse all 8150

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>