Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 8150

Switch a component to be picked from IM Storage Location

$
0
0

Hello Experts,

 

We have setup WM-PP interface for a component staging.

Now we have a requirement for a particular component to be back-flushed from an IM storage location (no WM).

In other words, among the components, this particular component will be back-flushed from a non-WM manage IM storage location.

To achieve this, I updated material master to back-flush and assigned the IM Sloc in BOM and MRP2 view of material master.

However the component still has a WM sloc assigned rather than the IM storage location that I want when I created a production order.

Am I missing something here? How can I achieve this?

Any help would be appreciated!

 

Regards,

Eddie


Viewing all articles
Browse latest Browse all 8150

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>