Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 8150

Quantity-Based Overhead Rates

$
0
0

Dear Experts,

 

      Quantity-Based Overhead Rates is not calculating  in my costing sheet when I do the costing  run

but percentage overheads is calculating. is there any separate setting are required for quantity based OH.


I have configured the below settings along with costing sheet


Overhead group in material master and that overhead group is defined in Costing Sheet

unit of measurement for material and the same unit of measurement is configured in Costing Sheet

In cost sheet i have defined OH rate and in OH rate i have given OH key with rate per unit


if there any problem if BOM components Unit of measures are different?

I have searched some other threads also I could not able to find out the reason where I did the mistake


Could you please provide me your inputs


Thanks & Regards

SRI


Viewing all articles
Browse latest Browse all 8150

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>