Dear Experts,
Quantity-Based Overhead Rates is not calculating in my costing sheet when I do the costing run
but percentage overheads is calculating. is there any separate setting are required for quantity based OH.
I have configured the below settings along with costing sheet
Overhead group in material master and that overhead group is defined in Costing Sheet
unit of measurement for material and the same unit of measurement is configured in Costing Sheet
In cost sheet i have defined OH rate and in OH rate i have given OH key with rate per unit
if there any problem if BOM components Unit of measures are different?
I have searched some other threads also I could not able to find out the reason where I did the mistake
Could you please provide me your inputs
Thanks & Regards
SRI