Hi,
I will describe the process we developed but I expect to get different opinions, about LSA model considering FULL LOAD for 2 different regions.
E.g:
Material Ledger (Hudge number o Records to upload)
- DataSource: 0CO_PC_ACT_1
- 2 regions (America and Europe)
DAL = PSA
DPL = 2 DSOs type Write-Optimized (each region)
ADM = 2 Infocubes (each region)
ADM = 1 MultiProvider
- Full Monthly Load
- Standard process, no routines, maximum reading some master data attributes.
- We are not maintaining records in the DSO (DPL), before to start the upload process we delete the data from last month from DSO.
Question:
- Do we really need the DSO? considering the concept could we upload direct to InfoCube ADM?
- Suggestions about this type of FULL upload process?